Partner Profile:
C Nagaraj
Infrastructure Expert


Construction Management | Contract Management | Project Controls
1. Nagaraj possesses over 34 years of international and domestic experience in Project management and contract handling for Highway and Metro rail construction.
2. He is well-versed in all facets of Project planning and monitoring from the Preconstruction phase to the close-out phase.
3. He's worked with agencies like the National Highways Authority of India (NHAI) and State Government undertakings.
About Nagaraj
Core Expertise
Project Planning and Monitoring, Preparation and Analysis of Project Schedules in Primavera.
Contract Management
Career Highlights / Key Projects
Have handled new construction methods like Void slab Box Girder.
Precast U girders, Segmental Viaduct Construction.
Adopted reinforcement bars cut to length as a special order for the Delhi metro project resulted in savings in steel.
Experience
Civil Engineer well-versed with the Model Concession Agreement of NHAI for BOT/ Annuity Projects.
Having exhaustive exposure in BOT / EPC projects of 4-laning and 6-laning of Highway projects involving flexible and rigid pavements.
Major Projects include:Kagal Satara 6-laning (rigid pavement) 65 km in Maharashtra.
Vadodora Bharuch 6-Laning of 83km in Gujarat.
Palanpur Swraupgunj 4-laning of 76 km in Gujarat.
Chennai Tada 6-laning of 43 km in Tamilnadu.
Beawer Pali Pindwara 4-laning for 232 km in Rajasthan.
Gandhidham Samkhiali 6-laning for 56 km in Gujarat.
Ambala Chandigarh 4-lane expressway 36 Km in Chandigarh.
Krishnagiri Walajahpet 6-laning project 130 km in Tamilnadu.
Farukh Nagar to Jadcherla and Adloor Yellareddy to Kalkala, totalling about 120 Km 4-laning in Andhra Pradesh.
Darkhar to Sarail Four-laning project for a length of 27km in Bangladesh
Engineering, Procurement, and Construction of a dual carriageway 25 km, including 4 nos. interchange, 5 nos. underpasses and 3 nos animal underpasses between Umm Bab and Dukhan in Qatar for Qatar Petroleum.
Involved in the construction of the Island breakwater, the first of its kind in Asia, at Chhara, Gujarat, for 4153 m in length, involving an Accropode of 16 m3.
Seabird Breakwater Construction at Karwar, Karnataka, of a length of 3200 m
Metro Rail Projects include the Dwarka Sub-city metro, an elevated viaduct for a length of 5.39 km. The project was fast-tracked and completed in 18 months. It involved a void Box slab and an integrated structure for the first time in the Delhi Metro.
Bangalore metro viaduct construction involving pile foundation, Precast pier cap, U girder of 40 m span and composite structures from KR Puram to Nagwara, 11 km in length.
Education
Bachelor of Engineering from Madras University
Building Trust | Resolving Complexities
+91 90032 80916
© 2025. All rights reserved. HDK Quantum Experts